One Centenary Way

Birmingham's first dedicated cycle hub in sustainable office building, at the city's new Paradise development.

Year delivered

2023

Project overview

Birmingham’s One Centenary Way is a 68 metre tall, 13 storey, 280,000 sq ft commercial building that’s soon to be occupied by Goldman Sachs, Arup, and JLL.

 

With public restaurant and bar space on the ground floor, the environmentally friendly building is part of the modern Paradise development in central Birmingham.

 

Proudly named Birmingham’s most sustainable new office building, One Centenary Way features pure electric heating and hot water, as well as SMART access to services, information, and facilities.

Objectives

Tool icon
Full bike store fit out
Cycle friendly design
Speech bubbles icon
Optimise layout and advise on specification choices

One of the most important features is Birmingham’s first-of-a-kind cycle hub. With 400 bike spaces planned, the cycle hub will be opened to the public once surrounding construction work is completed.

 

The basement bike store has direct street level access via a ramp, CCTV,  and bright, welcoming wayfinding and graphics throughout.

 

We worked for main contractor Sir Robert McAlpine to complete the bike store fit out. Using our powder-coated two-tier bike racks, we provided 144 high quality cycle parking spaces.

 

The black powder coating is the perfect match for the bike store’s branding, and provides a smart and smooth finish.

 

With rubber supports to protect your bicycle, gas-assisted lifting for the upper tier, noise-reduced tray runners, and locking points, the two-tier bike rack not only helps double capacity, but is safe and easy to use too.

Get in touch today
one centenary way cycle store turvec bike racks

Project team

Sam Lenehan headshot
Operations

Sam Lenehan

Lead Project Manager
Tito Vidotto
Operations

Tito Vidotto

Operations Manager
dylan project manager turvec
Operations

Dylan Colgan

Project Manager

What our clients have said

We relied on Turvec’s expertise to assist in an expansion of our bike store. Throughout the whole process their team were dependable and knowledgeable. The installation process was well communicated throughout and we are very happy with the finished work, which is to the highest standard."
Brookfield Properties
https://ml4e0gjyxzna.i.optimole.com/cb:dSXF.1a7bb/w:auto/h:auto/q:mauto/f:best/https://turvec.com/wp-content/uploads/2023/02/Brookfield-Properties.png

Related case studies

Our knowledge and expertise are informed by our experience of delivering quality bike facilities across a broad range of sectors for a variety of clients. Learn more about our previous work below.

Turvec are accredited by

Turvec Solutions is accredited with a number of industry certifications in relation to Health and Safety, competence and security. We are registered on all major procurement websites.