Temple Chambers

End-of-trip facility at refurbished office space Temple Chambers in the City of London, with 137 cycle spaces and electric bike charging

Year delivered

2023

Project overview

With 137 cycle spaces, our end-of-trip facility for Temple Chambers features e-bike charging, a bike repair station, folding bike lockers, and two-tier bike racks in a powder coated finish.

 

We were approached by Open Create Spaces after working with them on another end-of-trip facility at nearby St Paul’s. Working with the team, we helped finalise designs for the cycle parking before supplying and installing the project to the best possible standard.

 

Temple Chambers is a characterful building that has been recently refurbished to make the most of its prime City location. The new fit-out features small, affordable offices for small businesses.

Objectives

Tool icon
Efficiently install full bike store fit out
Cycle friendly design with a range of parking options
Speech bubbles icon
Optimise layout and advise on specification choices

They required cycle parking that was modern and efficient, to house the 137 spaces needed to cover the office full space.

 

Using two-tier cycle parking helps vastly increase the capacity of the bike store, with our two-tier racks offering rubber support to protect the bicycles, and easy gas lifting for the upper tier.

 

The dark green RAL6012 powder coating gives the products a smart, integrated look to suit the style and branding of the wider office fit-out.

 

For tenants, the end-of-trip facility is a secured, safe, and welcoming place to arrive on bike. It helps businesses encourage and support active travel for their employees, and is a strong asset for the building.

Get in touch today

Project team

Operations

Toby Blake

Project Manager
Sales

Max Jenns

Sales Executive
dylan project manager turvec
Operations

Dylan Colgan

Project Manager

What our clients have said

We relied on Turvec’s expertise to assist in an expansion of our bike store. Throughout the whole process their team were dependable and knowledgeable. The installation process was well communicated throughout and we are very happy with the finished work, which is to the highest standard."
Brookfield Properties
https://ml4e0gjyxzna.i.optimole.com/cb:dSXF.1a7bb/w:auto/h:auto/q:mauto/f:best/https://turvec.com/wp-content/uploads/2023/02/Brookfield-Properties.png

Related case studies

Our knowledge and expertise are informed by our experience of delivering quality bike facilities across a broad range of sectors for a variety of clients. Learn more about our previous work below.

Turvec are accredited by

Turvec Solutions is accredited with a number of industry certifications in relation to Health and Safety, competence and security. We are registered on all major procurement websites.