Termini Building

Secure Access | Year: 2020 | Sector: Commercial

Overview

Working for Walls Construction, Turvec installed 101 cycle parking spaces in a highly secure, functional bike store that works with low ceiling heights. With secure caging, the store provides ample parking for tenants of this new office building.

Design team:

Liam Turvec

Liam Carroll

Objectives

  • Fully maximise bike capacity
  • Provide fully secure cycle parking
  • Install secure caging
  • Design solution that works within low ceiling heights

Products

  • Semi-vertical rack
  • Cycle Toast rack
  • Secure cycle caging

What clients have said

Quotes icon

"Turvec had a product that they can design, manufacture and install which met our needs, it was a simple process."

Cala Homes

Expert advice within 60 minutes



    Cost-effective quotes

    Detailed project planning

    Expert advice

    Product demonstrations

    Related Projects

    Our knowledge and expertise are informed by our experience of delivering quality bike facilities across a broad range of sectors for a variety of clients. Learn more about our previous work below.

    The Kensington Building

    The Kensington Building is a major new sustainable office development in West London. Using 165 two-tier spaces, we worked for ISG to create a beautifully presented and functional bike store.

    Dashwood House

    Dashwood House stands high at 74 metres in the heart of London's financial district. Working directly for Collins Construction, Turvec supplied 100 two-tier spaces, folding bike lockers, and a bike repair station with pump.

    Glasgow Science Centre

    At Glasgow Science Centre, Turvec designed and installed an open-fronted timber Cubic cycle shelter. The project is complete to the highest standard, with full sedum roof, bike repair station, and two-tier parking.